Here is the new guest bedroom. The walls are done, but the closet door, carpet, and lighting fixtures still need to be installed.
That'll be a custom, drop in book shelf under the stairs, next to the door.
That's the way to the closet.
Here's the shower in the bathroom. The doors are still being made.
Here's a look at the floor. That white thing is where the toilet will be attached.
Here's the "bar" flooring. There will be a big cabinet on the wall here that will house the refrigerator and dish washer (both shown below), as well as a sink and a big counter area.
Of course, all of the blue/gray carpet is also about to go as well. We hope to have things ready for Cameron's pre-school graduation!
Love,
Ben and Cameron
No comments:
Post a Comment